The power of cell phone jammer is adjustable.
5.7.1 water supply and drainage project to the drainage and thermal engineering production, life, fire water by the park to the pipe network supply the plant with two DN200mm pipe water supply, water supply pressure P> 0.50MPa, the water quality, water pressure, water, water The pipe network can meet the demand of production, life, fire, water. This project, new water consumption of 20,000 tons, the supply pipe network of the park to meet demand. 16 projects an average annual displacement of 15,000 tons of sewage can be treated directly by the factory drainage pipe discharged into the local drainage network. 5.7.2 Heating The project intends to use central air conditioning heating. Construction of this project through a period of time, equipment installation work, will not have much noise, no more than "construction site noise limits" (GB12523-90) in the limit requirements. The customer can select cell phone jammer according to their actual needs.
The wastewater of the project during the construction of wastewater to sewage, the small extent of the impact on the surrounding environment. After treatment of GB8978-96 "discharged into the sewage pipe network, sewage discharge standards in Table 4 three emission standards. 3, 18 residue discharge of solid waste garbage in the process of building, sent to the designated waste disposal sites on a regular basis by the sanitation department to focus on collection, transport and classification processing. 6.2.2 The operation of the project during the environmental protection measures of the project in the research and design process, always put environmental protection as an important part of proposes to take the following measures: 1, waste water drainage of this project is mainly for domestic water, there is no any toxic and harmful chemicals ingredients, no adverse effects on the environment. Eye-catching shop channel identification to facilitate the flow, logistics flow. Strictly enforce building fire, lightning protection design specifications, reliable fire safety measures, evacuation routes, safety. Set on the production floor dressing room, bathroom, and a concentrated set of showers. The production plant set up the necessary skylights, ventilation equipment, and the whole room ventilation system. Set of local mechanical exhaust system and set up a mobile cooling fan for cooling. Set in the indoor and outdoor fire hydrant, and in the office, the library of raw materials, finished products, etc. Portable 1211 fire extinguishers. Fire water consumption. The personnel should perform these processes of cell phone jammer as soon as possible.
No comments:
Post a Comment